Monday, April 12, 2010

A Busy Day!

Why this kind of things will happen? Is normal for all construction sites ba...==

The site incident is just like playing the football. - Passing the ball round and round. Haiz,...

I still remembered last Saturday. Mr. Ting, haha=b, same first name as me, had complained to me about the perimeter drain. The drain base can't pass as the telephone's pipes are to high within the drain level. The sub-contractor of the electric pipe was there too. Then we discussed it together on how to solve the problem.

The next day, which is today, the sub-contractor of electric pipe does not proceed his works. Why? Because his BOSS, asked him, told him not to do it. Money again== What to do? Of course follows boss instruction la! haizzz....

Then, Mr Ting was so mad that he din't proceed his work. So he cuts off the pipe and proceeds his work concreting there. I try my best to stop him already. But, ...haiz... so stubborn. Luckily the M&E ppl who is in-charge of pipes come. Then he just orders his workers to dig the drain deep and level down the pipes.

According to him, the problem of pipes he doesn't know. == Actually, he is sitting in the office. Do nth in office beside online. He said again,...before concreting, must inform him first! ... Yet he did not go site one. How to know? He even don't know why the level needs to put so deep down. I think i can change position with him already. hahaha=b!!! After i explained, he just know. Waaa,...an engineer~ hahaha

He says again,' next time ar, don't cut the pipe, ok?'
"Got next time again meh?", I answered. He was speechless.

All things were solved. Except the main-hole's pipe. Wait and see tomorrow ba.

I explained so many times to so many people that want to know what was going on. The head of electric, the M&E people, The electric sub-contractor, my coordinator, my friend, workers....repeat and explain the same things 6 times. ==

Busy day ma?

No comments: